What You Need to File

The forms you need to file for a variation application depend on what issues you are addressing.

Forms are posted in interactive PDF Image removed. format and Word Image removed. format, where available.

If you are using the interactive PDF forms, be sure to download and save them to your computer to access all the features, including instructions to guide you through what information is required from you. 

 

1. Notice of Variation Application Form 59.12 Image removed. Form 59.12 Image removed..

2. Statement of Contact Information and Circumstances Form FD1 Image removed. Form FD1 Image removed..

3. Affidavit Form 39.08 Image removed. .

4. Certified copy of the order you want to vary.

5. Personal Representation Form Image removed. Form Image removed..

6. Filing Fee: $43.60 (as of April 2015) (fees are subject to change without notice)

OR

Completed Waiver of Fees form Image removed. with proof of your income attached.

7. Any supporting statements required - please see the next section 'Supporting Documents'.

 

When you are filing a variation application, you must generally provide the court with the original and three copies of every document, or at least a copy for the court, a copy for you, and a copy for every other party. 

Was this page helpful?